Before
Before
After
After

This project involved the refurbishment of George Salter Academies, 6th Form Boys WC’s during the schools Christmas end of term. The existing WC’s were stripped out of existing fixtures and fittings then the existing entrance doorway was blocked up with a new larger full height entrance way created. M&E and ventilation services were adapted to suit the new layout. Walls received full height hygienic wall panels along with new full height WC cubicles, Sanitaryware, Vanity unit, floor coverings, suspended ceiling, LED lighting and decorations.